New Blockwork and Plaster

This job was carried out after a fire incident. The open area was rebuilt with 4 inch blocks, then replastered in sand and cement, with a float finish (smooth finish plaster). A new plastic door was fitted and the wall was painted in masionary paint (quality exterior paint).

Artex Ceiling

The ceiling was damaged from a water leak. The old ceiling was taken down and new plasterboard was fitted. The joints were tapped and filled, thennew artex pattern (swirl) was applied to the ceiling which was 12.8m².

Bathroom Project

I am currently working on a bathroom which had been flooded by a burst pipe. The bathroom had to be gutted and remodelled. Here is the work I am doing on repairing the water damage: Bathroom Supply and fix wall titles around bath including bonding agent, adhesive and grout. Supply and fix new vinyl floor [...]